Welcome to Uttarakhand Irrigation Website
Hydro Elecricity
Vision
Activities
Achievements
Projects
Research
Design
Fabrication
Training
District Activities

Vision
 

Since Irrigation Department has been one of the oldest department responsible for the development of hydropower in the region, other infrastructural organisations viz. Irrigation Research Institute(IRI), Roorkee, Irrigation Design Organisation(IDO), Roorkee and ISO Certified Govt. Hydromechanical Workshop at Roorkee were also established with technically qualified and experienced Civil Engineers to achieve  excellence in the hydropower developmental activities.

Civil works of hydroelectric projects constitute above 80% of the total cost of these projects and the execution is carried out by Civil Engineers. Irrigation Department has been responsible for constructing the following hydroelectric projects in the region:

S. No.

Project

Year

Installed Capacity, MW

1.

Yamuna Hydroelectric Project Stage-I

(Dakpathar Barrage, Dhakrani, Dhalipur Power House)

1965

84.75

2.

Yamuna Hydroelectric Project Stage-II Part 1

(Ichari Dam and Chibro Power House)

1975

240

3.

Yamuna Hydroelectric Project Stage-II Part-2

(Khodri Power House)

1984

120

4.

Yamuna Hydroelectric Project Stage-IV Part 1

(Asan Barrage and Kulhal Power House)

1975

30

5.

Yamuna Hydroelectric Project Stage-IV Part 2

(Khara Hydroelectric Project)

1992

72

6

Gharwal Rishikesh Chilla Hydroelectric Project

1981

144

7.

Maneri Bhali Hydroelectric Project Stage-I

1984

90

8

Ramganga Project, Kalagarh

1976

198

 It is worthwhile to mention that Ramganga Dam Kalagarh, which was second largest earthen dam in the Asia, was built by the engineers and staff of the department, without any assistant of contractors, in the scheduled time and the same was appreciated by the then Hon’ble Prime Minister of India Smt. Indira Gandhi. Chilla Hydroelectric Project was also constructed by the department before the scheduled time and all the projects constructed by the department so far have been giving satisfactory service in the hydropower generation.

In addition to construction and maintenance of irrigation system, flood protection and drainage works, to cater the power needs the state irrigation department has also been planned a number of Hydro Power Projects after independence .

The Irrigation Department is also responsible for construction and maintenance of irrigation system, flood protection and drainage works in the hilly regions. The department has undertaken many flood control and soil erosion measures in Garhwal and Kumaon Divisions. In addition, avalanche resistant work in Badrinath; soil erosion works in Kedarnath and Gangotri have also been undertaken, to safeguard these holy places.

Yet there is problem of flood control and soil erosion in Udham Singh Nagar, Haridwar, Dehradun and few hill districts of Uttaranchal. To solve these problems, proposals are framed after intense survey by Irrigation Department and presented before the Technical Advisory Committee for technical approval and later sent to govt. for financial sanction.

 
Site designed & hosted by Webline Services
home Contact Us Consultancy About Us News & Updates