The
state of undivided Uttar Pradesh had set up the office of
the Chief Engineer Yamuna Valley Projects at Dehradun under
U.P. Irrigation Department some time around 1960 for construction
of Yamuna Valley Projects.
During
1970 another chiefship of Tehri Dam Project under Irrigation
Department was set up at Dehradun. Subsequently other wing
of Investigation and Planning was added for investigation
of various Hydro electric projects in Ganga and Yamuna Valley.
During
1975, Irrigation Design organisation was opened at Roorkee
and subsequently Irrigation Research Institute at Roorkee
was also extended in different fields of research and testing
units. The Department was already having well equipped Roorkee
workshop for fabrication and erection of Hydro mechanical
parts for Hydro electric projects.
|
|
In
the meantime post of Chief Engineer Ganga Valley Projects
was created for construction of Maneri-Bhali project. During
1981, Irrigation Department was further strengthened and the
post of Chief Engineer (Multipurpose and Hydroelectric projects)
of the status of Chief engineer level-I was created. During
1995, the running canals were added to the jurisdiction of
Chief Engineer (MHP) and it was renamed as Chief Engineer
(Uttarakhand).
After
formation of the new state of Uttarakhand, it is now known
as Chief Engineer (Uttarakhand).
Thus, from the initial stage Irrigation Department was engaged
in the planning and execution of the Hydro Electric Projects
in Uttarakhand.
|