The
design works of several multipurpose and hydroelectric
projects have been successfully completed during the
last three decades at Design Organisation. A few important
projects are :
Yamuna
Hydroelectric Scheme Stage-I
Commisioned
in 1965, it comprises a 576.5 m long barrage across
river Yamuna at Dakpathar to divert 200 cumec water
through a 14.3 km long power channel to the two power
houses at Dhakrani (33.75 MW) and Dhalipur (51 MW)
Yamuna
Hydroelectric Scheme Stage-II
A
60 m high and 155 m long concrete dam at Ichari to divert
the water of river Tons through 7.0 m dia 6.2 km long
tunnel to 240 MW underground powerhouse at Chibro. Tail
water is further taken through a syphon tunnel to 120
MW surface powerhouse at Khodri.
Ram
Ganga Project
This
multipurpose project comprises 127.5 m high, earth and
rockfill dam across river Ramganga at Kalagarh and 198
MW power house at the toe of dam. The tail water is
diverted into 84 km long channel to feed Lower Ganga
Canal and Ramganga Canal system.
Maneri
Bhali Hydroelectric Project Stage-I
The
project comprises 39 m high concrete dam across river
Bhagirathi, 8.6 km long tunnel and 90 MW underground
powerhose.
Garwhal
- Rishikesh - Chilla Hydroelectric Project
A
141 m long barrage near Rishikesh diverts the water
of river Ganga through 14.1 km long power channel to
Chilla surface power house of 144 MW. It was commissioned
in 1981.
Khara
Hydroelectric Project
The
tail water of Kulhal powerhouse is utilized through
13 km long power channel and 4.1 km long head race tunnel
to generate 72 MW at Khara power house.
Upper
Ganga Canal Modernisation Project
The
project comprises construction of a new canal of 370
cumec capacity parallel to the existing approximately
150 years old Upper Ganga Canal, including many cross
drainage works mainly Solani and Ratmau Aqueducts. Radial
gates for cross drainage structures have been designed
in this organisation.
Ganga
Barrage Kanpur
To
cater the present and future requirements of water of
Kanpur, 617 m long barrage and a prestressed bridge
have been constructed.
Maneri
Bhali Hydroelectric Project Stage-II
It
comprises 81 km long barrage across river Bhagirathi
at Uttarkashi, 16 m long 6 m dia tunnel and a surface
powerhouse of 304 MW.
Tehri
Dam Project
This
multipurpose project comprises of 260.5 m high earth
and rockfill storage dam across river Bhagirathi and
under ground power house of 1000 MW in phase-I and another
1000 MW in phase-II.
Detailed
design of diversion tunnels and preliminary design of
all other works were completed before handing over the
project to Tehri-Hydro Development Corporation.
Some
Imortant Hydrological Studies
Design
of Micro Hydel Schemes |